A vehicle can spend most of its shift assigned to deliveries and still carry little freight. Another can leave the depot full, return empty and wait for its next load. Calling either vehicle highly utilised without defining the measure gives the fleet manager very little to act on.

Fleet utilization has several useful meanings. Time measures describe how the working day is consumed. Loaded-distance measures describe how much travel carries goods. Payload measures describe how much of the available carrying capacity is used. Each can improve while another deteriorates.

The following example uses one hypothetical eight-hour shift. Its definitions are stated explicitly so the calculations can be reproduced. They are management measures for this analysis, rather than a claim that every operator uses the same reporting standard.

Define the fleet utilization formula before comparing vehicles

Start with a fixed reporting window and mutually exclusive activity categories. Here, the vehicle is assigned to a 480-minute shift. Every minute belongs to one category, with no overlap. A vehicle waiting while connected to a charger is recorded as charging, rather than counted in both categories.
Shift activity
Minutes
Distance
Cargo assumption
Loaded driving
160
80 km
600 kg for 40 km, then 300 kg for 40 km
Empty driving
80
40 km
No cargo
Loading and unloading
90
0 km
Stationary handling
Waiting for a receiver
60
0 km
Assigned but unable to hand over
Charging
60
0 km
No simultaneous transport work
Ready but unassigned
30
0 km
Available for dispatch
Total
480
120 km
Assumed usable payload limit: 1,000 kg

The 1,000 kg limit is an illustrative operating capacity, not a product specification. Assume it already reflects the relevant vehicle and duty restrictions. Weight is the limiting load measure for this example; bulky goods would also require a separate volume assessment.

These categories fit a recurring warehouse transfer duty, where a vehicle can be unavailable for another assignment while standing at a receiver. Report that waiting explicitly. Hiding it inside productive time may make the utilisation figure look better while service becomes less dependable.

Measure time according to the work you want to understand

For this example, define transport-task time as loaded driving, empty driving, loading and unloading. The time-based fleet utilization rate is transport-task minutes divided by scheduled shift minutes. The calculation is (160 + 80 + 90) / 480, or 68.75%.

That definition includes the empty return because it is part of completing the transport cycle. It excludes waiting for the receiver, charging and unassigned time. The choice is useful for identifying how much of the scheduled shift supports transport activity, but the component breakdown must remain available.

If a team instead reports driving time, the result is 240 / 480, or 50%. If it reports time committed to an assignment, including receiver waiting, the result becomes 390 / 480, or 81.25%. All three calculations use the same shift. They answer different questions and should carry different labels.

Keep the denominator consistent across reporting periods. Removing charging from the denominator would change the 68.75% result to 330 / 420, or 78.57%, even though the vehicle completed no extra work. That can be a useful separate operating-window measure, but presenting it as an improvement in the original measure would be misleading.

Measure loaded distance without confusing it with fullness

The loaded-distance share is loaded kilometres divided by total kilometres. Here, 80 / 120 gives 66.67%. One-third of the distance is empty travel. The measure helps reveal opportunities to pair a return movement with another suitable task or adjust the sequence of stops.

A vehicle carrying a single carton still contributes loaded kilometres. This measure therefore cannot show whether the cargo space or weight capacity was well used. A return collection may improve the loaded-distance share while adding only a small quantity of freight and a substantial loading delay.

For vehicle utilization decisions, compare the extra handling time with the value of the collected load and the next departure commitment. A higher loaded-distance share is useful only if the additional task fits. Sending the vehicle to a distant pickup solely to eliminate an empty leg can increase total travel and weaken service.

Measure payload across the distance it travels

For the loaded legs, use a distance-weighted payload measure: carried kilogram-kilometres divided by available kilogram-kilometres over those same legs. The numerator is (600 × 40) + (300 × 40), or 36,000 kg-km. The denominator is 1,000 × 80, or 80,000 kg-km. Loaded-leg payload utilisation is 45%.

If the objective is to assess capacity across the entire route, include the empty 40 km in the denominator. The result is 36,000 / (1,000 × 120), or 30%. Label this as whole-route payload utilisation. It answers a broader question than the 45% loaded-leg result; neither should replace the other without explanation.

Use verified capacity for each leg if restrictions or vehicles differ. For a mixed fleet, add the carried kilogram-kilometres and available kilogram-kilometres before dividing. Averaging the percentages of a small vehicle and a large vehicle can give the wrong fleet result when their capacities or distances differ.

Real route descriptions offer a starting point, but rarely supply every input. In its June 2026 report on DHL's Changzhou service, Zelostech describes a public-road commercial route between an express service centre and a display-equipment customer's production site, approximately 38 km per trip with a 1.5-hour average transit time. Those figures identify a transport leg; they do not reveal shift utilisation or payload fullness.

An operator assessing the Singapore-based company's Z5 RoboVan for comparable work would still need actual loads, return movements and non-driving time. The Changzhou project is in China, and its reported 38 km distance is a single trip rather than a complete daily duty. It cannot be used on its own to calculate fleet utilization or payload performance.

Use the measures together when deciding fleet size

The worked shift points to several possible actions. Sixty minutes of receiver waiting suggests investigating acceptance capacity. Forty empty kilometres suggest examining compatible return work. The 45% loaded-leg payload result suggests reviewing consolidation, provided delivery windows and cargo handling allow it. These are different interventions, not interchangeable ways to increase one headline score.

When deciding how to calculate fleet size, begin with required work and its timing. In a separate planning example, assume 24 identical cycles per day, each taking 40 minutes including handling and return travel. If each vehicle has 360 usable minutes after planned non-task allowances, the aggregate workload requires 960 / 360, rounded up to three vehicles.

Three is only an aggregate lower bound under those assumptions. Four simultaneous, non-combinable departures require four available vehicles at that moment, even if daily workload could fit into three. Charging conflicts, authorised routes, maintenance cover and service variability also need to be tested against the timetable. Do not apply an arbitrary utilisation target twice by reducing usable minutes and then adding the same allowance again.

Make the fleet utilization report explain the next action

A useful fleet utilization report names the reporting period, activity definitions, capacity assumptions and excluded records. Show the three measures beside completed deliveries, missed windows and the largest sources of delay. Flag missing timestamps or unverified load weights instead of silently treating them as zero.

Fleet utilization metrics are most useful when each one points to a specific operational problem. In this example, additional vehicles would not resolve a receiver bottleneck, while fuller loads would not necessarily improve departure reliability. Keeping time, loaded distance and payload utilization separate makes it easier to identify whether the next action should involve scheduling, consolidation, route design or fleet size.

Shaping the Future
of Autonomous Logistics

Empowering organizations worldwide to move goods safely, efficiently, and sustainably with autonomous logistics solutions.

Zelostech autonomous delivery vehicle icon

2 Science Park Drive, #02-08 Ascent, Singapore 118222

marketing@zelostech.com | global@zelostech.com

Products Applications Experience Center News About Us

Get Zelostech Updates